1MI Desa, A.H. Christer. Modelling in the Absence of Data: a Case Study of Fleet Maintenance in a Developing Country[J]. European Journal of Operational Research Society, 2001.
2A. H. Christer. lnnovatory Decision Making in: The Role and Effectiveness of Theories of Decision Practice(D.L. White &K. C. Brown, Ed s )[M]. Hodder & Stoughton,1973.
3A. H. Christer, W. Wang. A Delay-time-based Maintenance Model of a Multi-component System [J]. Journal of Mathematics Applied in Business and Industry,1995,(6).
4A. H. Christer. Developments in Delay Time Analysis for Modeling Plant Maintenance [J]. Journal of Operational Research Society, 1999,(50).
5W.Wang, A.H.Christer. Solution Algorithms for a Non-homogeneous Multi-component Inspection Model [J]. Computer and Operation Research, 2003, 30,(1).
6Ruben Ruiz. Considering Scheduling and Preventive Maintenance in the Flowshop Sequencing Problem [J]. Computers and Operations Research, 2007,34,(1).
7Y. Guo. Machine Scheduling Performance with Maintenance and Failure[J]. Mathematical and Computer Modeling, 2007,45(2).
8M. C. Eti. Reducing the Cost of Preventive Maintenance through Adopting a Proactive Reliability-focused Culture [J]. Computers and Operations Research, 2007,34(1).
9A.H. Christer. W. Wang. Modeling Maintenance Practice of Production Plant Using the Delay-time Concept [J]. Journal of Mathematics Applied in Business and Industry, 1995,(6).