期刊文献+

沿空掘巷掘进时机确定方法研究 被引量:3

Study on determination method of driving timing in roadway driving along goaf
下载PDF
导出
摘要 为了避免沿空掘巷掘进扰动应力和工作面回采应力的叠加造成巷道应力环境的恶化以及巷道支护的困难,采用FLAC 3D数值模拟软件,分析了沿空掘巷时空效应,数值模拟了工作面采空侧实体煤侧向应力分布、巷道沿轴向的应力峰值分布以及沿空掘巷掘进时机确定。研究结果为类似矿井沿空掘巷采掘接续时间的安排提供了指导。 In order to avoid the stress environment deterioration and the difficulty of roadway support caused by the superposition of disturbance stress and mining stress along the goaf,using FLAC 3D numerical simulation software,the time and space effect of driving along goaf is analyzed,the lateral stress distribution of the solid coal at the goaf side,the peak stress distribution along the axial direction of the roadway and the determination of the driving time along the goaf are simulate.The research results provide guidance for the arrangement of mining connection time of gob side entry in similar mines.
作者 张道文 Zhang Daowen(Juji Coal Mine,Yongcheng Coal Company,Henan Energy and Chemical Industry Group,Yongcheng 476600,China)
出处 《能源与环保》 2019年第12期184-186,190,共4页 CHINA ENERGY AND ENVIRONMENTAL PROTECTION
关键词 沿空掘巷 掘进时机 FLAC 3D数值模拟 侧向应力 轴向应力 roadway along the goaf timing of excavation numerical simulation of FLAC 3D lateral stress axial stress
  • 相关文献

参考文献6

二级参考文献62

共引文献18

同被引文献12

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部