从我国大型露天矿采煤半连续工艺发展的需要出发,综合运用露天采矿学原理、采矿系统工程、技术经济学和机械设计等方法,对露天矿坑底破碎站工艺布置、结构形式、移设参数及对剥离工艺的影响等内容展开深入研究。最终以露天矿效益最大化为目标形成了破碎站坑下布置的工艺方案和适合新工艺移设要求的结构形式。
According to development needs of semi-continuous coal mining process system in largescale coal open pit mines in China,synthetically applying the methods of open pit mining principles,mining system engineering,technical economics and mechanical design,the process layouts,structural forms,transfer parameters and influences in the stripping process of the crushing station on the open pit mine bottom were researched.Finally,aiming at maximum benefits of the open pit mines,the process layout of crushing station on the open pit mine bottom and the structural form for the new process transfer requirements were formed.
作者
李申岩
梁媛媛
Li Shenyan;Liang Yuanyuan(Shenyang Engineering Company,China Coal Technology and Engineering Group,Shenyang 110015,China)
出处
《煤矿机械》
北大核心
2019年第12期119-121,共3页
Coal Mine Machinery
基金
中国煤炭科工集团有限公司科技创新创业资金专项(2018MS019)
关键词
工艺布置
结构形式
移设参数
process layout
structure type
transfer parameter