右江水力发电厂励磁系统技术改造 被引量:2

Technical modification of excitation system at Youjiang Hydropower Plant
下载PDF
导出
摘要 针对右江水力发电厂4#机组励磁系统调节器存在的设备老化和故障问题,论述了实现基于EXC9200的励磁系统调节器改造方案及励磁系统改造过程中发现的一个缺陷及处理方法。并介绍了改造后机组的运行情况:实现了部分设备的国产化,改善了设备使用的便利性和经济性。进行改造后励磁系统交接试验,试验结果满足相关规范要求。 In view of the aging and failure problem of No.4 generator excitation system regulator of Youjiang Hydropower Plant, the authors present the modification scheme based on EXC9200, a defect found in the course of technical modification and the solution. An introduction was made on the operation status of unit after modification. Localization of some equipment was realized. The convenience and economy of equipment use were improved. The results of the excitation system handover test after the modification all met the requirements of relevant specifications.
作者 唐力 李兴文 TANG Li;LI Xing-wen(Guangxi Youjiang Water Resources Development Co.,Ltd.,Nanning 530028,China)
出处 《广西水利水电》 2019年第6期62-64,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 右江水力发电厂 励磁系统控制器 技术改造 Youjiang Hydropower Plant excitation system controller technical modification
  • 相关文献

参考文献2

二级参考文献3

同被引文献20

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部