摘要
北方某县城拟建设一座垃圾焚烧电厂,在垃圾量满足锅炉运行的条件下,兼顾供热。通过对比分析,选择适合的机组以及供热方式。
A waste incineration power plant is planned to be built in a county in the north of China,with heat supply taken into account when the amount of waste meets the requirements of boiler operation.Through comparative analysis,select the appropriate unit and heating mode.
作者
李兴国
Li Xingguo(Forestry Design and Research Institute of Heilongjiang Province,Harbin Heilongjiang 150080)
出处
《林业科技情报》
2019年第4期103-104,109,共3页
Forestry Science and Technology Information
关键词
垃圾焚烧锅炉
抽凝机组
低真空供热
Waste incineration boiler
condensate extraction unit
low vacuum heating