期刊文献+

惠州龙颈水电站的建设对水生生态环境的影响研究 被引量:1

The Aquatic Ecological Environment Impact Assessment of Hydropower Station in Huiyang Dragon Neck
下载PDF
导出
摘要 惠阳区龙颈水电站工程于 2006 年 2 月建成运行。需对运营期的环境影响进行全面、详细的分析,并提出有效的污染防治措施及生态保护对策。本文针对运营期的生态环境影响因素,依据生态环境影响评价技术导则,编制了该工程的水生生态环境影响评价,结果表明工程建设具有较大的经济效益、社会效益,且工程本身在运行期产生污染较少,通过采取相应的环境保护措施,生态环境影响均可得到一定程度的缓解与恢复。 The long neck hydropower station project was built in February 2006, but it has not yet been completed so far. According to the construction project environmental impact factors, according to the guidelines for ecological environment impact assessment, the ecological environment impact assessment of the project is compiled. The results show that the construction of the project has great economic benefits and social benefits, and the pollution of the project itself is less during the operation period. By taking the corresponding environmental protection measures, the impact of the ecological environment can be alleviated and restored to a certain extent.
作者 秦建桥 凡宸 白玉杰 Qin Jianqiao;Fan Chen;Bai Yujie(Shenzhen Degree of Freedom Sci-Tech Co.,Ltd.,Shenzhen 518000;College of Environmental and Chemical Engineering,Zhaoqing University,Zhaoqing 526061,China)
出处 《广东化工》 CAS 2019年第24期78-80,共3页 Guangdong Chemical Industry
基金 深圳市科技研发资金(深科技创新[2016]100号) 肇庆市科技计划项目“肇庆城区分散式污水高效深度处理及回用关键技术研发”(编号:2018N001) 广东省教育厅特色创新类项目(自然科学)"基于生物强化和过程控制的高效污水处理及原位污泥减量关键技术研发”(编号:2018KTSCX251)
关键词 惠阳区龙颈水电站 生态环境 影响评价 HuiYang dragon neck hydropower station the ecological environment impact assessment
  • 相关文献

二级参考文献31

共引文献49

同被引文献35

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部