期刊文献+

基于“双控”维修模式的装备维修计划制定方法 被引量:2

Equipment Maintenance Plan Formulation Method Based on “Double Control” Maintenance Mode
下载PDF
导出
摘要 考虑到装备存在使用效能下限和维修能够恢复装备效能,提出了装备效能衰减模型。基于控计划和经费的"双控"维修模式,考虑装备都是成体系运用的现实情况,以一个年度内装备体系效能最大化为目标,提出实际维修过程中所要考虑的诸多约束条件,运用粒子群算法进行模型的优化求解。最后结合具体示例分析证明了模型和算法的有效性,得到了满足各项约束条件的最优方案,为装备维修计划的制定提供了理论依据。 Considering the equipment’s lower performance limit and maintenance can restore equipment efficiency,an equipment performance attenuation model was proposed.Based on the“double control”maintenance mode of controlling plan and funding,considering the fact that equipment is a system-based operation,and aiming at maximizing the efficiency of the equipment system in an annual year,it put forward many constraints to be considered in the actual maintenance process.The group algorithm performed the solution of the model.Finally,the validity of the model and algorithm was proved by the specific example analysis.The optimal scheme to meet the constraints was obtained,which provides a theoretical basis for the formulation of the equipment maintenance plan.
作者 周成杰 蒋铁军 ZHOU Chengjie;JIANG Tiejun(Navy University of Engineering,Wuhan 430000,China)
机构地区 海军工程大学
出处 《兵器装备工程学报》 CAS 北大核心 2019年第12期125-130,共6页 Journal of Ordnance Equipment Engineering
关键词 效能衰减 双控 体系效能 维修计划 performance attenuation double control system performance maintenance plan
  • 相关文献

参考文献11

二级参考文献91

共引文献92

同被引文献13

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部