摘要
总结并分析了某整车制造企业燃煤改燃气改造项目系统整体实施方式及路径,介绍设计安装改造各阶段容易忽视的安全相关问题,探讨理想的行业内煤改气实施方案。
This paper summarizes and analyzes the overall implementation mode and path of the coal to gas transformation project system of a vehicle manufacturing enterprise, introduces the safety related problems that are easy to be ignored in each stage of design, installation and transformation, and discusses the ideal implementation scheme of coal to gas transformation in the industry.
作者
覃平阳
QIN Ping-yang(SAIC-GM-Wuling Automobile Co.,Ltd.,Liuzhou Guangxi 545007,China)
出处
《装备制造技术》
2019年第10期115-118,共4页
Equipment Manufacturing Technology