一种特殊地形下安全快速地拆除V型拉线塔的施工技术 被引量:1

Construction Technology for Safely and Quickly Removing V-shaped Cable Tower under Special Terrain
下载PDF
导出
摘要 随着时代的发展和我国基础设施的逐步建设,各项建设都在有条不紊的进行。电力是我国生产生活中必不可少的能源,并且国家在该方面的建设过程中也投入了较多的人力物力,但是随着时代的推移,部分的拉线塔的使用年限较长,其实际的工作能力也受到了一定的影响,因此需要为了使得输电安全,需要对其进行拆除,并且及时更新为更加安全的电塔形式。本文主要根据笔者的相关研究以及前期提出的专利进行撰写,讨论了在特殊地形下V行拉线塔的拆除技术,通过这种技术将使得其拆除速度进一步的提升,并且可以保证施工人员的安全施工,希望能够为后期的研究者提供一定的参考。 With the development of the times and the gradual construction of China's infrastructure,various constructions are proceeding in an orderly manner.Electricity is an indispensable energy source in China's production and life,and the country has invested more manpower and material resources in the construction of this area.However,with the passage of time,some cable towers have a longer service life and the working capacity has also been affected to some extent.So in order to make the transmission safe,it needs to be dismantled and updated in time to a more secure form of electrical tower.This article,mainly based on the author's related research and the patents proposed earlier,discusses the removal technology of the V-line cable tower under special terrain.With this technology,the removal speed will be further improved,and the safety of the construction workers can be guaranteed.
作者 王明新 WANG Ming-xin(Guangdong Power Grid Energy Development Co.,Ltd.,Guangzhou 510160,China)
出处 《价值工程》 2020年第1期266-268,共3页 Value Engineering
关键词 特殊地形 V型拉线塔 施工技术 special terrain V-shaped cable tower construction technology
  • 相关文献

参考文献3

二级参考文献7

共引文献5

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部