摘要 本文结合临港工业区中粮佳悦新建包装厂辅材库项目管桩基础工程情况,对该项目的桩基锤击桩施工技术进行探讨。把桩基锤击桩施工技术运用到工程项目中,可保证工程桩基施工质量,提高仓库项目的基础工程质量,能为同类工程提供参考。 In this paper, the construction technology of pile foundation hammering pile is discussed based on the project of pipe pile foundation in the auxiliary material depot of Jiayue New Packaging Plant of Zhongliang in Lingang Industrial Zone. Through the application of pile foundation hammering pile construction technology in engineering projects, the quality of pile foundation construction can be protected, and the quality of foundation engineering of warehouse project can be improved, hoping to provide some reference for similar projects.
作者 赵豪放 ZHAO Haofang(China Railway 18 Bureau Group Construction and Installation Engineering Co.Ltd,Tianjin 300308,China)
出处 《洛阳理工学院学报(自然科学版)》 2019年第4期44-47,54,共5页 Journal of Luoyang Institute of Science and Technology:Natural Science Edition
关键词 仓库项目 桩基锤击桩 施工技术 warehouse project pile foundation hammering pile construction technology
  • 相关文献

参考文献9

二级参考文献18

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部