以永安煤矿西三中间巷为研究对象,对预应力桁架锚索被应用于采动垮冒煤巷的支护机理进行了分析。运用中性轴理论分析了顶板在无支护条件下以及采取预应力桁架锚索支护后顶板内部受力情况及支护前后拉压应力区的变化情况,确定了桁架锚索合理的底部跨度以及合适预应力大小的计算方法。对永安煤矿西三中间巷采用了桁架锚索联合支护设计方案,监测数据理想,该支护设计可以较好地控制巷道变形问题。
Taking the Xisan Middle Roadway of Yong’an Coal Mine as the research object,the supporting mechanism of prestressed truss anchor cable applied to mining caving roadway is analyzed.Based on the neutral axis theory,the internal force of the roof and the variation of the tension and compression stress zone before and after the support are analyzed under the condition of no support and the prestressed truss anchor cable support,and the reasonable bottom span of the truss anchor cable and the calculation method of the appropriate prestress are determined.The truss anchor cable combined support design scheme is adopted for the west three middle roadway of Yong’an Coal Mine,and the monitoring data is ideal.The support design can control the deformation of the roadway well.
作者
张朝勇
Zhang Chaoyong(Qinghe Energy Group Co.,Ltd.Yongan Coal Mine,Jincheng Shanxi 048205)
出处
《机械管理开发》
2019年第12期51-52,169,共3页
Mechanical Management and Development
关键词
桁架
采动影响
预应力
桁架锚索
truss
mining influence
prestress
truss anchor cable