期刊文献+

煤矿井工成套设备控制技术的研究

Research on Control Technology of Complete Set of Equipment in Coal Mine
下载PDF
导出
摘要 介绍井工成套设备配置及刮板输送机负载情况,通过对该矿井工输送系统进行分析,针对井工成套设备煤量负荷理论进行计算,基于刮板输送机煤流负荷制定调速策略,从而达到节能降耗、降低磨损的目的。 The equipment configuration of the well and the load of the scraper conveyor are introduced.By analyzing the transportation system of the mine,the load theory of the coal of the well is calculated,and the speed regulation strategy is established based on the load of the coal flow of the scraper conveyor,so as to achieve the energy-saving and consumption reduction.And the purpose of abrasion is reduced.
作者 张文辉 Zhang Wenhui(Ventilation Team of Zhenchengdi Mine Ventilation Section of Xishan Coal and Electricity Group,Gujiao Shanxi 030203)
出处 《机械管理开发》 2019年第12期168-169,共2页 Mechanical Management and Development
关键词 煤量负荷计算 协同速度控制 节能降耗 coal quantity load calculation cooperative speed control energy saving and consumption reduction
  • 相关文献

参考文献4

二级参考文献9

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部