期刊文献+

基于主成分分析和LightGBM的风电场发电功率超短期预测 被引量:9

Ultra-short-term Prediction of Wind Farm Power Generation Based on Principal Component Analysis and Light GBM
下载PDF
导出
摘要 风力发电场发电功率的超短期预测越精确,越有利于电力系统的稳定运行和优化调度。为提高风电场发电功率超短期预测的准确率,提出了一种基于主成分分析(PCA)和轻量梯度提升树(LightGBM)的风电场发电功率超短期预测方法。该方法首先进行主成分分析,将与风电功率相关程度低的维度剔除,降低数据的冗余性。然后利用LightGBM建模,实现风电场发电功率的超短期预测。实验结果表明,基于LightGBM的风电场发电功率超短期预测效果良好,优于传统机器学习方法在风电场超短期功率预测上的精度。 The more accurate in the ultra-short-term prediction of wind farm power generation,the more favorable on the stable operation and optimal dispatch of the power system.In order to improve the accuracy of ultra-short-term prediction of wind farm power generation,an ultra-short-term prediction method for wind farm power generation based on principal component analysis and gradient boosting macheine(GBM)algorithm is proposed.The method first performs PCA to eliminate the low dimension with correlation on wind power,and reduces data redundancy.Then GBM algorithm is used to model the ultra-short-term prediction of wind farm power generation.The experimental results show that the wind power generation power based on GBM algorithm has a good short-term prediction effect,which is better than the traditional machine learning method in the ultra-short-term power prediction of wind farms.
作者 曹渝昆 朱萌 CAO Yukun;ZHU Meng(School of Computer Science and Technology,Shanghai University of Electric Power,Shanghai 200090,China)
出处 《上海电力学院学报》 CAS 2019年第6期562-566,共5页 Journal of Shanghai University of Electric Power
关键词 LightGBM 风电功率预测 特征筛选 主成分分析 LightGBM wind power prediction feature screening principal component analysis
  • 相关文献

参考文献5

二级参考文献76

共引文献819

同被引文献122

引证文献9

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部