夹岩水利枢纽工程长石板隧洞施工开挖支护方案优化调整研究 被引量:5

Study on Optimization and Adjustment of Construction and Excavation Support Plan of Changshiban Tunnel in Jiayan Water Control Project
下载PDF
导出
摘要 夹岩水利枢纽长石板隧洞4号与5号支洞之间洞段全风化围岩在富水状态下,施工期出现围岩变形松弛、初期支护拱壁收敛缓慢、施工扰动基岩泥化,导致出现支护钢拱架变形、喷混凝土开裂和渗水等问题。文章结合地质揭露成果,按已挖段、试验段和待挖段三个洞段,实施隧洞开挖及支护方案优化设计,并及时调整支护结构参数,成功解决了软岩、强岩溶等地质段围岩抗变形稳定问题。优化调整方案与工程实际匹配性好,支护衬砌结构经济合理。 The completely weathered surrounding rock in the tunnel section between No.4 and No.5 branch tunnel of Changshiban Tunnel in Jiayan Water Control Project shows deformation and relaxation of surrounding rock,the slow convergence of the primary supporting buttress,and argillization of the disturbed bedrock during construction under the condition of rich water,thereby leading to the deformation of the supporting steel arch,the cracking of shotcrete and water seepage,etc.The optimized design of tunnel excavation and support scheme is implemented according to the three excavation sections,namely the excavated section,the experimental section and the to-be-excavated section in the paper according to the geological exposure results,and the supporting structure parameters are adjusted timely.The surrounding rock anti-deformation stability problems in the geological section are successfully solved,such as soft rock,strong karst,etc.The optimization and adjustment plan is well matched with the engineering practice,and the support lining structure is economical and reasonable.
作者 张晓君 ZHANG Xiaojun(Guizhou Water Conservancy Investment(Group)Co.,Ltd.,Guiyang 550008,China)
出处 《中国水能及电气化》 2019年第11期60-64,59,共6页 China Water Power & Electrification
关键词 夹岩水利枢纽工程 开挖支护 方案 优化 Jiayan Water Control Project excavation and support plan optimization
  • 相关文献

参考文献5

二级参考文献11

共引文献20

同被引文献34

引证文献5

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部