期刊文献+

水利工程评标综合评估法刍议 被引量:1

On comprehensive evaluation method of bid evaluation for water conservancy projects
下载PDF
导出
摘要 目前我国水利工程招标投标中常用的评标办法是综合评估法,该方法将评标因素进行分值量化,评委通过量化的评分标准进行综合评价打分,并确定综合评分排序,可在一定程度上明确投标文件是否满足招标文件中规定的各项评价标准,具有一定的科学性,但在实施过程中也存在着一些弊端。本文结合新疆克州托帕水库大坝工程实际情况对综合评估法进行分析探讨,并提出建议,以期为类似工程评标提供借鉴。 Comprehensive evaluation method is a commonly used evaluation method in tendering and bidding of China water conservancy projects. The score quantitative assessment is implemented for evaluation factors in the method. Judges carry on the comprehensive evaluation score through quantitative scoring criteria, thereby determining the comprehensive score sorting, and making clear whether the tender documents meet all criteria specified in the tender documents to a certain extent or not. It is certainly scientific, but there are also some shortcomings in the implementation process. Actual situation of Tuopa reservoir dam project is combined for analyzing and discussing the comprehensive evaluation method in the paper, and suggestions are proposed to provide reference for similar project bid evaluation.
作者 罗永席 管芙蓉 LUO Yongxi;GUAN Furong(Hubei Shuizong Water Resources and Hydropower Construction Co.,Ltd.Wuhan 430056,China)
出处 《水利建设与管理》 2019年第12期45-48,共4页 Water Conservancy Construction and Management
关键词 水利工程 招标投标 评标办法 综合评估法 water conservancy project bidding and tendering bid evaluation method comprehensive evaluation method
  • 相关文献

同被引文献12

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部