摘要 在建设项目竣工环保验收过程中,验收自查是整个竣工环保验收中重要的环节。以江苏某燃煤电厂为例,依据《建设项目竣工环境保护验收技术指南污染影响类》及其行业特点,分析自查要点,做好项目验收自查工作,确保验收工作的顺利开展,为其他项目的环保验收提供参考和保障。 In the course of the working completion and environmental protection check and acceptance of the construction project,the check and acceptance and self-examination are an important link in the working completion and environmental protection check and acceptance.By taking Jiangsu a certain coal-fired power plant as an example,and in accordance with the“Technical Guide on Working Completion and Environmental Protection Check and Acceptance of Construction Project,Pollution Influence Category”and its industry characteristics,the paper analyzes the self-examination main points,carries out the check and acceptance and self-examination for the project,ensures the smooth development of the check and acceptance works,and provides reference and guarantee for the environmental protection check and acceptance on the other projects.
作者 安风霞 胡知田 AN Feng-xia;HU Zhi-tian(Guodian Environmental Protection Research Institute Co.,Ltd,Nanjing 210031;State Environmental Protection Key Laboratory of Atmospheric Physical Modeling and Pollution Control,Nanjing 210031,China)
出处 《中国环保产业》 2019年第12期44-45,49,共3页 China Environmental Protection Industry
关键词 燃煤电厂 环保验收 自查要点 coal-fired power plant environmental protection check and acceptance self-examination main point
  • 相关文献

参考文献7

二级参考文献17

共引文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部