摘要
以内蒙古呼和浩特抽水蓄能电站机组为例,统计了机组投产以来发生的启动失败数据,对影响机组启动成功率的启动失败和非计划停运等因素进行了分析;并针对影响机组正常启动的重点系统和设备,制订了更改控制流程、调整空载开度限值、修改策略设定等治理措施。
The data of start failure and unscheduled shutdown since the unit has been put into operation are analyzed in Inner Mongolia Hohhot Pumped-Storage Power Station.The various factors affecting the success rate of unit start-up are summarized. The treatment measures are taken for the key equipments according to the factors affecting the normal start-up of the units.
出处
《内蒙古电力技术》
2019年第6期10-13,共4页
Inner Mongolia Electric Power
关键词
抽水蓄能机组
运行工况
非计划停运
启动失败
静止变频启动装置
pumped-storage unit
operation condition
unplanned outage
startup failure
static frequency conversion startup device