关于CRH3型动车组转向架高级修静载试验的工艺优化 被引量:1

Process Optimization of Static Load Test for Bogie Advanced Overhaul CRH3 EMU
下载PDF
导出
摘要 伴随动车组保有量的快速增长以及行车里程的累积,大量上线运营的动车组列车进入高级修周期,如何保质保量完成生产任务,满足上线需求是摆在各检修基地的一大考验。通过对CRH3型动车组转向架高级修作业时静载试验项目的优化分析,实现降低动车组转向架检修作业的返工和浪费,提升动车组转向架检修能力,为节约整车修时、提升整体产能打下基础。 With the rapid growth of the EMU and the accumulation of mileage,a large number of on-line EMU trains entered the advanced repair cycle.How to fulfill the production tasks and meet the on-line demand is a major test at various maintenance bases.In this paper,through the optimization analysis of the static load test of the CRH3 type EMU bogie during the advanced repair operation,the rework and waste of the maintenance work of the EMU bogie can be reduced,and the maintenance capability of the EMU bogies will be improved.This will lay the foundation for saving the vehicle repair time and improving the overall capacity.
作者 毛东 MAO Dong(Postgraduate Department,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China;Shanghai EMU Dopot,China Railway Shanghai Bureau Group Co.,Ltd.,Shanghai 201200,China)
出处 《铁道机车车辆》 北大核心 2019年第6期96-98,125,共4页 Railway Locomotive & Car
关键词 动车组 高级修 静载试验 工艺优化 EMU advanced repair static load test process optimization
  • 相关文献

参考文献2

二级参考文献2

共引文献4

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部