摘要
随着社会的发展,科学技术的进步,地铁隧道工程技术的使用也更为专业化和精细化。地铁隧道盾构始发施工过程是整个工程系统中最为关键的一部分。盾构始发工作不仅与工程的进度、质量、安全等息息相关,还与其整个工程的使用寿命紧紧相连,影响经济效益和长久发展。本文将就地铁隧道盾构法概述、地铁隧道盾构始发施工技术的前、中、后工作准备和过程等进行阐述。
With the development of society and the progress of science and technology,the use of subway tunnel engineering technology has become more professional and refined.The initial construction process of a subway tunnel shield is the most critical part of the entire engineering system.The launch of the shield is not only closely related to the progress,quality and safety of the project,but also closely linked to the service life of the entire project,which affects the long-term development and economic benefits.This article explains the overview of the subway tunnel shield method,the preparation and process of the subway tunnel shield launching construction technology.
作者
岳承欢
YUE Cheng-huan(China Construction Communications ENGRG.Group Corp.,Ltd.,Beijing 100142,China)
出处
《价值工程》
2020年第2期171-172,共2页
Value Engineering
关键词
地铁隧道工程
盾构法
施工技术
安全
subway tunnel engineering
shield method
construction technology
safety