摘要
某水电站冲沙孔在施工期即发生破裂坍塌事故,采用ANSYS建立冲沙孔段的三维有限元模型,对冲沙孔结构进行复核计算分析。通过应力图计算结构配筋,与实际配筋对比,分析冲沙孔破裂的原因。
The sand flushing sluice of a hydropower station ruptured and collapsed during construction.ANSYS is used to establish a three-dimensional finite element model of the sand flushing sluice section,and the check calculation and analysis of the sand flushing sluice structure are carried out.The reinforcement of the structure is calculated based on the stress diagram,and compared with the actual reinforcement to analyze the cause of the rupture of the flushing sluice.
作者
袁秋霜
邓成进
王亚娥
YUAN Qiushuang;DENG Chengjin;WANG Ya'e(PowerChina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出处
《西北水电》
2019年第6期104-107,共4页
Northwest Hydropower
关键词
冲沙孔
破裂坍塌
结构配筋
复核计算
sand flushing hole
rupture and collapse
structural reinforcement
review calculation