竖缝对风力发电机组装配式混凝土塔筒结构特性的影响分析 被引量:3

Analysis of Influence of Vertical Joints on Structural Characteristics of Fabricated Concrete Tower Tube of Wind Turbine
下载PDF
导出
摘要 预制装配式混凝土风机塔筒是将塔筒沿高度分成若干环段,每环段等分成若干片运输便利的预制混凝土构件,再由环片拼装形成整体,并通过预应力锚固体系和环向连接件保证整体性能的新型塔筒方案。该方案具有预制构件尺寸可控、施工便利、现场安装简易等优势。文章采用ANSYS有限元软件,研究竖缝对预制装配式混凝土塔筒结构特性的影响,结果表明:预制装配式混凝土塔筒竖缝对风机塔架整体结构的固有频率影响较小,但可导致结构受力不均匀而引起局部环向拉应力偏大;合理的纵向预应力体系有利于装配式塔筒的竖向和环向受力;竖缝缝面通过环向连接件可以实现环向结构的整体性。 The prefabricated concrete wind turbine tower is divided into several ring sections along the height,and each ring section is equally divided into several pieces of prefabricated concrete components that are convenient for transportation,and then assembled into tower tube by the ring sections.Overall performance of the new tower solution is guaranteed by the prestressed anchor system and annular connectors.This solution has the advantages of controllable size of prefabricated components,convenient construction,and simple on-site installation.The article adopts ANSYS finite element software to study the influence of vertical joints on the structural characteristics of prefabricated concrete tower.The results show that the vertical joints of prefabricated concrete towers have less influence on the natural frequency of the overall structure of the wind turbine tower;However,the vertical joints cause uneven stress to the structure which results in high circumferential tensile stress at local section;reasonable longitudinal prestressing system facilitates the vertical and circumferential stress of the assembled tower;the vertical joint surface can realize integrity of the circumferential structure through the annular connectors.
作者 田伟辉 刘静 陆希 TIAN Weihui;LIU Jing;LU Xi(PowerChina Northwest Engineering Corporation Limited,Xi'an 710065,China;Northwest Branch of National Hydropower Wind Energy Research Center,Xi'an 710065,China)
出处 《西北水电》 2019年第6期108-112,共5页 Northwest Hydropower
关键词 塔筒 预制混凝土 竖缝 环向连接 tower tube precast concrete vertical joints annular connection
  • 相关文献

参考文献3

二级参考文献31

  • 1李志梅,赵东标.风电技术现状及发展趋势[J].电气技术,2007,8(6):48-50. 被引量:14
  • 2李德源,叶枝全,陈严.风力机旋转叶片的多体动力学数值分析[J].太阳能学报,2005,26(4):473-481. 被引量:30
  • 3RYAN K,JASON C. Hydrogen storage in wind turbine towers [J]. International Journal of Hydrogen Energy, 2004,29(12): 1277-1288.
  • 4D J Malcolm, Wind PACT rotor design study: Hybrid tower design[J]. Subcontrator report, 2004, (4) : 10-16.
  • 5R Kottenstette,J Cotrell. Hydrogen Storage in Wind Turbine Towers[J].Technical Report, 2003, (9):17-21.
  • 6American Wind Energy Association[J].Global Wind Energy Market Report,2004, (3):29-55.
  • 7李围,叶裕明,刘春山,等.ANSYS土木工程应用实例.2版[M].北京:中国水利水电出版社,2007:5-7.
  • 8江见鲸,陆新征,叶列平.混凝土结构有限元分析[M].北京:清华大学出版社,2006:132-133.
  • 9熊礼俭.最新风力发电新技术与发电工程设计、运行、维护及标准规范实用手册[M].香港:中国科技文化出版社,2007.
  • 10曾攀.有限元分析及应用[M].北京:清华大学出版社,2006.

共引文献39

同被引文献20

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部