摘要 水电工程移民是一项复杂的系统工程,也是一个世界级难题。几内亚苏阿皮蒂水利枢纽项目移民规模大,涉及范围广,移民周期长;几内亚没有户籍制度,库区人口及实物指标调查面临极大的困难;缺乏完整的移民法律法规体系和大规模的移民经验,移民工作实施难度大;经济发展水平落后,移民文化水平和生活水平低,生产生活严重依赖耕地。通过采取一系列创新化的移民安置实施管理模式,因地制宜,从多个方面提出苏阿皮蒂项目移民管理模式,取得了较好的成果。 The resettlement of hydropower project is a complex and systematic system,and it is a world-class problem.The resettlement scale of Souapiti Hydro Project is larger and characterized with wide scope and long periods.Due to the lack of household registration system in Guinea,the investigations of population and real object index in reservoir submersion area become difficult.Since the absence of resettlement law and resettlement management experiences,the implementation of resettlement is also very difficult.Undeveloped economy and lower culture level and living standard of resettlers lead to the livelihoods of resettlers relying heavily on agriculture.By taking a series of innovative resettlement management modes,the resettlement management of Souapiti Hydro Project has achieved better results.
作者 杜安康 高甫 郭亮辉 史伟亮 DU Ankang;GAO Fu;GUO Lianghui;SHI Weiliang(China International Water&Electric Corp.,Beijing 100120,China)
出处 《水力发电》 北大核心 2020年第1期6-9,19,共5页 Water Power
关键词 移民 水电工程 管理模式 苏阿皮蒂水电站 resettlement hydropower project management mode Souapiti Hydropower Station
  • 相关文献

参考文献5

二级参考文献11

共引文献25

同被引文献14

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部