几内亚苏阿皮蒂大坝混凝土温控浅析

Analysis on Concrete Temperature Control of Souapiti Dam in Guinea
下载PDF
导出
摘要 几内亚苏阿皮蒂水利枢纽项目为碾压混凝土重力坝,工期紧,混凝土量大。工程所在区域旱季(11月~4月)、雨季(5月~10月)气候分明,月均温差不大。根据工程现场温度、湿度等环境条件与中国存在较大差异的特点,采取了与国内常规做法有差异的混凝土温控措施,取得了较好的效果,为在类似地区混凝土温度控制积累了经验。 The dam of Souapiti Hydro Project in Guinea is a RCC gravity dam with tight construction time and large concrete pouring volume.The climate in project area is clearly distimct between the dry season(November to April)and rainy season(May to October),and the monthly average temperature difference is smaller.Because the environmental conditions such as temperature and humidity are more different to China,the concrete temperature control measures that are different from conventional practices in China are adopted and good results have been achieved,which has accumulated experiences for concrete temperature control in similar areas.
作者 罗小平 郭亮辉 王凤林 张申 LUO Xiaoping;GUO Lianghui;WANG Fenglin;ZHANG Shen(China International Water&Electric Corp.,Beijing 100120,China)
出处 《水力发电》 北大核心 2020年第1期53-54,70,共3页 Water Power
关键词 大体积混凝土 温控措施 苏阿皮蒂水利枢纽工程 mass concrete temperature control measures Souapiti Hydro Project
  • 相关文献

参考文献2

二级参考文献12

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部