期刊文献+

500 kV变电站的施工组织设计研究 被引量:1

Research on Construction Organization Design of 500 kV Substation
下载PDF
导出
摘要 随着我国各地经济的快速发展和人民生活的不断改善,电力已经成为现代生产、生活的必须品。为保障供电的数量和质量,近年来,各地区都在积极投资电力基础设施,以500 kV取代220 kV成为骨干输变电网络的工程建设正加速实施。作为电力基础设施的重要部分,变电站不仅担负着电压转换的重要作用,还是电网规划、布局的核心。变电站工程的施工有极强的专业性与综合性,不仅施工工期紧、技术要求高,而且不可避免的交叉作业非常多。为促进500 kV变电站施工组织技术的进步,提升施工质量和施工效益,文中对500 kV变电站施工组织设计技术进行了研究。 With the rapid development of the economy in all parts of China and the continuous improvement of people’s lives,electricity has become a necessity for modern production and life.In order to ensure the quantity and quality of power supply,in recent years,all regions are actively investing in power infrastructure,and the construction of a 500 kV to replace 220 kV as a backbone power transmission and transformation network is accelerating implementation.As an important part of the power infrastructure,the substation is not only responsible for the important role of voltage conversion,but also the core of power grid planning and layout.The construction of the substation project is extremely professional and comprehensive,not only with tight construction schedules,high technical requirements,but also inevitable cross-operations.In order to promote the progress of construction technology of 500 kV substation,improve construction quality and construction efficiency,the author combines years of substation construction experience,the author launched the technical research of 500 kV substation construction organization design.
作者 沈志辉 Shen Zhi-hui
出处 《电力系统装备》 2019年第24期45-46,共2页 Electric Power System Equipment
关键词 变电站施工 500KV变电站 施工组织设计 substation construction 500 kV substation construction organization design
  • 相关文献

参考文献2

二级参考文献5

共引文献2

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部