期刊文献+

10kV冷缩电缆头工艺制作故障及对策

Manufacturing Faults and Countermeasures of 10 kV Cold Shrinkable Cable Head
下载PDF
导出
摘要 10 kV冷缩电缆头是电缆设备的重要组成部分,通常是通过埋管进行铺设,因此在安装过程中会处于潮湿的环境中,造成水树枝的故障。这就需要在制作阶段保证10 kV冷缩电缆头的质量,严格控制10 kV冷缩电缆头的制作工艺。本文将针对10 kV冷缩电缆头工艺制作故障及对策展开分析。 10 kV cold shrinkable cable head is an important part of cable equipment,which is usually laid through buried pipes,so it will be in a humid environment during the installation process,resulting in the failure of water branches.It is necessary to ensure the quality of 10 kV cold shrinkable cable head and strictly control the manufacturing process of 10 kV cold shrinkable cable head.In this paper,the manufacturing failure of 10 kV cold shrinkable cable head and its countermeasures are analyzed.
作者 李上军 Li Shang-jun
出处 《电力系统装备》 2019年第24期93-94,共2页 Electric Power System Equipment
关键词 10kV冷缩电缆头 水树枝 工艺制作 10 kV cold shrinkable cable head water branch process manufacturing
  • 相关文献

参考文献5

二级参考文献5

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部