期刊文献+

含翻水线的两库系统联合调度优化方法研究 被引量:1

Optimization method for joint operation of two reservoirs with a series of pumping stations
下载PDF
导出
摘要 丰水地区水库和泵站系统水资源优化调度的目标应该是解决系统季节性缺水、弃水、补水共存的矛盾。针对含有翻水线的两库系统,对系统的联合调度控制参数设计正交试验,然后采用动态规划对子系统模型进行求解,可以同时获得两座水库最优的供、弃水量过程和两座泵站最优的提水量过程将该方法应用于江苏省南京市六合区山湖水库与泥桥水库及其翻水线的联合调度方案中,以2016年为例,在满足系统需水的前提下,可以减少25.7%的系统年总补水量,节约245 h的杲站运行时间,降低了系统的运行成本。 The optimization purpose of a reservoir-and-pumping-station system in humid areas should be determining the optimal joint operation policy to reduce water spills of reservoirs,water replenishments of pumping stations,and meeting water demands.An optimization method for joint operation of a two-reservoir system with a series of pumping stations in humid areas is proposed in this paper.The method is based on dynamic programming and orthogonal test,and the dynamic programming is used to solve the subsystem models and orthogonal test is used to derive the joint operation policy between the subsystems,which can finally obtain the operation scheme both of the reservoirs and pumping stations.The proposed method was applied to the joint operation scheme of Shanhu Reservoir and Niqiao Reservoir with their sharing pumping stations in Liuhe District,Jiangsu Province,China.The results showed that the optimization method could reduce water replenishment of the system by 25.7%and save the operation time of pumping stations by 245 h in 2016,which reduced the operation cost.
作者 龚志浩 GONG Zhihao(School of Hydraulic Science and Engineering,Yangzhou University,Yangzhou 225009,China)
出处 《水资源与水工程学报》 CSCD 2019年第5期155-160,共6页 Journal of Water Resources and Water Engineering
基金 江苏省研究生科研创新计划(KYCX19_2105)
关键词 含翻水线的两库系统 泵站 联合调度 动态规划 正交试验 reservoir-and-pumping-station system pumping station joint operation dynamic programming orthogonal test
  • 相关文献

参考文献9

二级参考文献29

共引文献39

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部