规划未覆盖支路市政管线规划审批方法探讨——以深圳市为例

Discussion on the approval method for the planning of uncovered branch municipal pipelines——Take Shenzhen as an example
下载PDF
导出
摘要 为应对规划未覆盖支路市政管线的规划审批需求、提升市政规划管理效能,在分析规划未覆盖支路形成原因的基础上,通过成熟片区案例调查分析法、典型规划片区普遍需求分析法和对比分析法三种方法,研究提出规划未覆盖支路上的各类市政管线规划审批要点及实施建议。 In order to cope with the planning approval requirements of the planned unsupervised branch municipal pipelines and improve the efficiency of municipal planning management,on the basis of analyzing the reasons for the unplanned branch roads,through the mature case case investigation analysis method,the typical planning area general demand analysis method and comparison The three methods of analysis method,the research proposes the planning approval points and implementation suggestions for various types of municipal pipelines that are not covered by the planned road.
作者 陈如波 刘江涛 Chen Rubo;Liu Jiangtao(Shenzhen Urban Planning&Land Resource Research Center,Shenzhen 518040,China)
出处 《城市勘测》 2019年第S01期109-114,共6页 Urban Geotechnical Investigation & Surveying
关键词 规划未覆盖支路 市政管线 规划审批要点 市政供应末端 市政负荷需求 Planning uncovered branch roads Municipal pipelines Planning approval points Municipal supply end Municipal load demand
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部