摘要
为应对规划未覆盖支路市政管线的规划审批需求、提升市政规划管理效能,在分析规划未覆盖支路形成原因的基础上,通过成熟片区案例调查分析法、典型规划片区普遍需求分析法和对比分析法三种方法,研究提出规划未覆盖支路上的各类市政管线规划审批要点及实施建议。
In order to cope with the planning approval requirements of the planned unsupervised branch municipal pipelines and improve the efficiency of municipal planning management,on the basis of analyzing the reasons for the unplanned branch roads,through the mature case case investigation analysis method,the typical planning area general demand analysis method and comparison The three methods of analysis method,the research proposes the planning approval points and implementation suggestions for various types of municipal pipelines that are not covered by the planned road.
作者
陈如波
刘江涛
Chen Rubo;Liu Jiangtao(Shenzhen Urban Planning&Land Resource Research Center,Shenzhen 518040,China)
出处
《城市勘测》
2019年第S01期109-114,共6页
Urban Geotechnical Investigation & Surveying
关键词
规划未覆盖支路
市政管线
规划审批要点
市政供应末端
市政负荷需求
Planning uncovered branch roads
Municipal pipelines
Planning approval points
Municipal supply end
Municipal load demand