摘要
城市地下综合管廊的建设是未来城市发展的生力军,它的建立将彻底杜绝了由管线运营商自行开挖敷设导致的施工混乱、资源浪费、重复开挖等弊端。为了避免地下综合管廊工程出现质量问题,需要在竣工时对工程进行整体测量。以平潭综合实验区为例,从确定综合管廊竣工测量方案、收集资料、数据采集、数据处理等方面进行了详细阐述,并对存在的问题提出了处理方法。
The construction of the city utility tunnel has become the new force in city construction and development.The disorganized construction by different pipeline company could result in the waste of resources and the repetitive excavation.To avoid any more quality issues,we have to do the whole measurement when the project is finished.This paper,in Pingtan comprehensive experimental zone,for example,discussed about how to determine the measurement scheme,how to collect the information and the data,and how to analyze data.In addition,this thesis put forward solving methods in view of the pr oblems.
作者
吴昌锋
杨群
Wu Changfeng;Yang Qun(Fuzhou CityConstruction Design&Research Institute Co.Ltd,Fuzhou 350001,China)
出处
《城市勘测》
2019年第S01期126-129,共4页
Urban Geotechnical Investigation & Surveying
关键词
综合管廊
竣工测量
数据处理
处理方法
The city utility tunnel
Measurement
The data processing
The data processing method