结合既有浑白铁路线换梁实际施工情况,提出了换梁施工方案,并对换梁过程中的施工技术、施工组织、保证措施等进行了详细的介绍,以供借鉴。
Combined with the actual construction of the existing Hun-Bai iron line beam replacement,it is put forward beam replacement construction plan.It introduces the construction technology and organization guarantee measures in the process of beam replacement in detail for reference.
出处
《辽宁省交通高等专科学校学报》
2019年第6期26-30,共5页
Journal of Liaoning Provincial College of Communications
关键词
既有线
换梁
施工技术
existing railway line
beam replacement
construction technology