摘要
在复杂地质中进行地铁施工,降水工程是一大难点。为此,文章结合厦门轨道交通1号线火炬园站—高殿站区间矿山法施工实例,对如何提高复杂地质条件下的降水效果施工质量技术进行深入研究,为后续施工提供经验借鉴。
Tn the process of urban railway subway construction,how to effectively precipitation in a complex geological is a heavy and difficult points of engineering,this paper combined with Xiamen rail transit line 1—Huo Ju Yuan Station to Gao Dian Station region mine tunneling method construction as an example,To intensive study quality technology to how to improve the precipitation effect in a complex geological,and provide some experience for t he future construction.
作者
马端玉
Ma Duanyu(The Fifth Construction Co.Ltd.of cccc Fourth Harbor Engineerin g Co.,Ltd.,Fuzhou,Fujian 350000)
出处
《工程技术研究》
2019年第23期66-67,共2页
Engineering and Technological Research
关键词
花岗岩残积土
矿山法
降水
质量技术
granite residual soil
mine tunneling method
precipitation
quality technology