京张高铁张家口南站钢结构施工BIM应用关键技术研究 被引量:8

Research on key technologies of BIM application in steel structure construction management of Zhangjiakou South Station of Beijing-Zhangjiakou high-speed railway
下载PDF
导出
摘要 依托张家口南站钢结构施工管理开展了较为完整和全面的BIM技术探索,从结构验算、场地规划、复杂节点优化、钢结构算量4个方面开展了关键技术研究和应用,覆盖了高铁站房钢结构施工的主要工程难点,为其他高铁站房钢结构施工应用BIM技术提供借鉴和参考. This paper relies on steel structure construction management of Zhangjiakou South Station to carry out a comprehensive BIM technology exploration,and studies the key technologies such as steel structure checking,site planning,complex node optimization and steel structure quantity calculation,covering main aspects of construction of high-speed railway station steel structure.The research results provide references for the application of BIM technology in the construction of other high-speed rail station steel structure.
作者 解亚龙 王万齐 范志强 刘伟 XIE Yalong;WANG Wanqi;FAN Zhiqiang;LIU Wei(Institute of Computing Technology,China Academy of Railway Sciences Corporation Limited,Beijing100081,China;Beijing Jingwei Information Technology Company,Beijing 100081,China)
出处 《北京交通大学学报》 CAS CSCD 北大核心 2019年第6期75-84,共10页 JOURNAL OF BEIJING JIAOTONG UNIVERSITY
基金 中国铁路总公司科技研究开发计划重点课题(2017G001-D) 中国铁道科学研究院集团有限公司课题(2018YJ121)~~
关键词 京张高铁 钢结构BIM应用 复杂节点优化 工程量计算 Beijing-Zhangjiakou high-speed railway BIM application of steel structure complex node optimization steel structure quantity calculation