期刊文献+

中小学装配式建筑暖通设计分析 被引量:2

HVAC Design Analysis of Prefabricated Buildings in Primary and Secondary Schools
下载PDF
导出
摘要 预制装配式中小学建筑的空调设计方案确定初期,需要预留空调风管井,并确定各穿墙孔洞的位置,高度也需精确确定,以便构建深化工作的展开。另外,需要及早向相关专业工作人员提供防排烟井的位置及大小,确定排烟口等风口的位置等。论文通过对中小学装配式建筑的研究分析,给出在中小学装配式建筑设计中空调系统以及防排烟系统的设计建议。 In the initial stage of determining the air conditioning design scheme for prefabricated primary and secondary school buildings,air conditioning duct wells shall be reserved, and the position and height of each hole through the wall shall be precisely determined, so as to facilitate further construction. In addition, it is necessary to propose the position and size of the smoke well as well as the exact position of the air outlet such as the smoke vent to the relevant professiona staff. Based on the research and analysis of prefabricated buildings in primary and secondary schools, the paper gives some suggestions on the design of air conditioning system and smoke control system in the design of prefabricated buildings in primary and secondary schools.
作者 刘春燕 LIU Chun-yan(Jiangsu Long-Leaping Engineering Design Co.Ltd.,Nanjing 210014,China)
出处 《工程建设与设计》 2019年第24期34-35,共2页 Construction & Design for Engineering
关键词 中小学 装配式 空调 防排烟 primary and secondary schools fabricated air conditioning smoke control
  • 相关文献

同被引文献6

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部