期刊文献+

既有铁路桥梁改建顶进施工道岔加固技术 被引量:2

Reinforcement Technology for the Jacking Construction Switch of Existing Railway Bridges Reconstruction
下载PDF
导出
摘要 近年来,既有铁路桥涵新增或改扩建工程逐年增多,特别是铁路道岔加固及使用D型便梁条件受限的顶进工程。论文结合工程实例,详细阐述既有铁路桥梁改建顶进施工道岔加固技术的施工工艺,为相关工程提供参考。 In recent years, the number of new railway bridges and culverts has been increased or expanded, especially in the case of railway ballast reinforcement and the use of D-shaped beam conditions. Combined with the engineering example, the paper elaborates the construction technology of the jacking switch reinforcement technology for the existing railway bridge reconstruction, and provides reference for the related workers.
作者 徐艳华 XU Yan-hua(China Railway Seventh Bureau Xi'an Rail Engineering Company,Xi'an 710032,China)
出处 《工程建设与设计》 2019年第24期89-90,共2页 Construction & Design for Engineering
关键词 既有铁路 顶进 道岔加固 existing railway jacking ballast reinforcement
  • 相关文献

参考文献1

二级参考文献1

共引文献1

同被引文献14

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部