期刊文献+

基于新一轮预算编制办法和定额的铁路与公路隧道工程造价水平对比分析 被引量:9

Comparative Analysis of Cost Level of Railway and Highway Tunnel Engineering Based on New Round Budget Compilation Method and Quota
下载PDF
导出
摘要 为反映铁路、公路隧道工程在新一轮概预算编制办法和定额条件下的造价水平差异,为各级铁路隧道施工组织管理者进行造价管理提供参考。论文以样本隧道为载体,从编制办法、定额水平和综合指标3个层次量化对比分析铁路隧道工程造价水平与公路隧道工程造价水平的差异,得出了虽然高速铁路隧道的设计标准和质量标准均高于高速公路,但是铁路隧道工程综合造价指标低于公路18.5%~27.4%的结论。 In order to reflect the difference of cost level between railway and highway tunnel engineering under the new round of budget estimation method and quota condition, and provide reference for railway tunnel construction organization managers at all levels to carry out cost management. This paper takes sample tunnel as carrier and quantitatively compares the difference between railway tunnel engineering cost level and that of highway tunnel engineering from three levels, compilation method, quota level and comprehensive index.It is concluded that the design standard and quality standard of high speed railway tunnel are higher than those of expressway, but the comprehensive cost index of railway tunnel engineering is lower than 18.5% ~ 27.4% of highway.
作者 杜海蓉 DU Hai-rong(China Railway No.2 Engineering Group Co.Ltd.,Chengdu 610032,China)
出处 《工程建设与设计》 2019年第24期201-204,共4页 Construction & Design for Engineering
关键词 铁路与公路隧道 工程造价水平 对比分析研究 railway and road tunnels project cost level comparative analysis
  • 相关文献

同被引文献39

引证文献9

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部