摘要
介绍下行式移动模架静载实验的目的和工艺流程以及模架预拱度值的计算,重点介绍加载原则、加载顺序、测试点布置、数据分析处理方法及如何确定模架施工预拱度。
Introduces the purpose and technological process of the static load experiment of the downward moving mould base and the calculation of the pre-arch value of the mould base, with emphasis on the loading principle, loading sequence, arrangement of test points, data analysis and processing method and how to determine the pre-arch degree of the mould base construction.
作者
严朝成
何文静
Yan Chaocheng;He Wenjing(Loudi Vocational and Technical College,Loudi 417000,China)
出处
《现代盐化工》
2019年第6期49-50,共2页
Modern Salt and Chemical Industry
关键词
下行式移动模架
测点布置
分级加载
数据分析
预拱度
downward moving mold base
measuring point arrangement
hierarchical loading
data analysis
pre-arch