期刊文献+

超大型集装箱船货物增加改造方案 被引量:1

Container Ships Need to be Renovated Due to Increased Cargo Volume VLCS Conversion Scheme for Cargo Boost
下载PDF
导出
摘要 针对某航运公司的六艘16000TEU集装箱船货物增加改造项目,结合相关的设计经验,从舱盖加强改造、舱口围加强改造、绑扎桥类型选择、绑扎桥结构舾装设计、绑扎桥建造工艺等各个方面,探讨集装箱船货物增加改造方案。 This paper focuses on the conversion of six 16000 TEU container ships for cargo boost.Based on the design experience of relevant professional design units,this paper discusses the conversion scheme from the aspects of hatch cover reinforcement,hatch coaming strengthening,type selection of lashing bridge,structure and outfitting design of lashing bridge,and construction technology of lashing bridge.
作者 谭建均 揭斌 林欢 TAN Jianjun;JIE Bin;LIN Huan(Guangzhou Wenchong Dockyard,Guangzhou 511462)
出处 《广东造船》 2019年第6期88-90,84,共4页 Guangdong shipbuilding
关键词 绑扎桥典型结构形式 绑扎桥舾装设计 绑扎桥建造方案 Typical structure form of lashing bridge Lashing bridge outfitting design Lashing bridge construction scheme
  • 相关文献

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部