5Sally Kassem,Mingyuan Chen. Solving reverse logistics ve-hicle routing problems with time windows [ J]. The Interna-tional Journal of Advanced Manufacturing Technology ,2013,68(14) :57-68.
6De Oliveira H C B, Vasconcelos G C. A hybrid search meth-od for the vehicle routing problem with time windows [ J].Annals of Operations Research, 2010,180( 1 ) : 125-144.
7Calvete H I,Gale C,Oliveros M,et al. A goal programmingapproach to vehicle routing problems with time window [ J].European Journal of Operational Research,2007,177 ( 3 ):1720-1733.
8Qureshi A G, Taniguchi E, Yamada T. An exact solutionapproach for vehicle routing and scheduling problems withsoft time windows [ J] . Transportation Research Part E: Lo-gistics and Transportation Review,2009,45(6) :960-977.
10Zhang Jun-long, William H K Lam, Chen Bi-yu. A sto-chastic vehicle routing problem with travel time uncertain-ty :trade-off between cost and customer service [ J ] . Net-works and Spatial Economics, 2013,13(4) :471496.