摘要
工程规模论证是综合利用水利枢纽工程可行性研究阶段的重要工作内容,其成果直接影响到工程建设的合理性和投资效益。以大兴水利枢纽工程为例,阐述了本项目需水量预测、水资源供需分析与配置以及水库工程规模、电站装机容量等工程规模论证的主要思路、方法等技术要点以及论证主要成果,以期为同类型地区综合利用水利枢纽工程建设规模论证提供借鉴。
The project scale argument is the important work in the feasibility study stage of the comprehensive water-control project,and the results directly influence the reasonability and the investment benefits of the project construction.In this essay,it takes the example of Da Xin Water-Control project to state the main idea and methods to the water demand prediction,water supply and demand analysis,and the argument of the reservoir project scale and hydropower station installed capacity.It also gives the argument results as the examples to comprehensive water-control projects in the same type area.
作者
刘武军
王晓云
张忠广
Liu Wujun;Wang Xiaoyun;Zhang Zhongguang(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin,300222)
出处
《水利水电工程设计》
2019年第3期15-16,64,共3页
Design of Water Resources & Hydroelectric Engineering
关键词
水利枢纽工程
供需分析与配置
水库工程规模
装机容量
water-control project
supply and demand analysis
reservoir project scale
installed capacity of unit