盾构机过矿山法空段计算及隧道成型质量控制

Calculation of Empty Section of Shield Machine and Quality Control of Tunnel Forming
下载PDF
导出
摘要 广州地铁某项目区间隧道采用矿山法+盾构机空推进行施工。通过严格控制推进过程中的掘进机姿态、豆粒石堆填、二次注浆质量、管片拼装质量、测量监控等施工工序,盾构机顺利完成空推段施工任务,工程施工质量、成本、工期均取得了非常好的效果。 Based on Huangmugang station of Shenzhen Metro Line 7, this paper studied the influence of foundation pit excavation on pile foundation of adjacent overpass. By simulating three conditions of excavation depth, distance and rigidity of retaining pile, the influence characteristics of foundation pit excavation on pile displacement and stress of adjacent overpass under different working conditions are obtained. The results show that the maximum lateral displacement of bridge pile foundation appears in the middle and inclines to the direction of foundation pit under three conditions. With the increase of excavation depth, the lateral displacement, vertical settlement and Mises stress of bridge pile foundation increase. With the increase of distance between bridge pile foundation and excavation foundation pit, the lateral displacement, vertical settlement and Mises stress of bridge pile foundation decrease. With the increase of retaining structure rigidity, the lateral displacement of adjacent piles decrease.
作者 惠世前 魏百术 雍振杰 林超 李博 HUI shi-qian;WEI Bai-shu;YONG Zhen-jie;LIN Chao;Li Bo
出处 《云南水力发电》 2019年第6期114-116,共3页 Yunnan Water Power
关键词 矿山法 盾构机 空推 推力 反推力 注浆 subway station foundation pit excavation bridge pile numerical model
  • 相关文献

参考文献12

二级参考文献43

共引文献79

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部