摘要 抽样方案的变化影响聚能射孔器穿孔深度检验的严格程度。在起草SY/T 6163—2018《油气井聚能射孔器通用技术条件及性能试验方法》时,检索到拟引用标准更新导致抽样方案中的样本量、接收常数发生了变化,为了保持抽样方案的连续性,沿用了GB/T 20489—2006旧标准中的抽样方案。以外径89 mm聚能射孔器为例,对比分析了不同时期评价标准中穿孔深度抽样方案及对应合格率,发现SY/T 6163—2018中给出的接收质量限(AQL)值有偏差且合格率偏高。建议使用新的穿孔深度抽样方案:检验水平为Ⅰ、接收质量限为2.5、样本量为18孔/m和接收常数(k)为1.429,更加科学地评价穿孔深度质量水平。 The change of sampling plan affects the strictness of perforation depth inspection of jet perforator.When drafting SY/T 6163-2018“General specifications and test methods of shaped charge perforating equipment for oil and gas well”,it was found that the renewal of the cited standard resulted in the change of sample size and receiving constant in the sampling plan.In order to maintain the continuity of the sampling plan,the sampling plan in the old standard GB/T 20489-2006 was used.Taking the shaped charge perforator with the outer diameter of 89 mm as an example,the sampling plans of perforation depth in different evaluation standards and the corresponding qualified rates are comparatively analyzed,and it is shown that the acceptance quality limit(AQL)value given in SY/T 6163-2018 has deviation and the qualified rate is high.It is suggested to use a new sampling plan for perforation depth:the inspection level is I,the acceptance quality limit(AQL)is 2.5,the sample size is 18 holes/m and the acceptance constant(k)is 1.429,which is helpful to evaluate the quality level of perforation depth more scientifically.
作者 荆立英 郭金荣 董喜庆 Jing Liying;Guo Jinrong;Dong Xiqing(Quality Supervision and Inspection Center for Perforating Equipment in Oil and Gas Fields of Petroleum Industry,Daqing 163853,Heilongjiang,China;Oil Production Engineering Research Institute,PetroChina Daqing Oilfield Co.,Ltd.,Daqing 163453,Heilongjiang,China;The Third Oil Production Plant,PetroChina Daqing Oilfield Co.,Ltd,Daqing 163453,Heilongjiang,China)
出处 《石油工业技术监督》 2020年第1期16-19,共4页 Technology Supervision in Petroleum Industry
关键词 聚能射孔器 穿孔深度 抽样方案 检验水平 shaped charge perforator perforation depth sampling plan inspection level
  • 相关文献

参考文献4

二级参考文献13

  • 1李东传,金成福,刘亚芬,余海鹰.射孔器混凝土靶穿孔深度评价指标研究[J].石油工业技术监督,2006,22(5):13-15. 被引量:2
  • 2GB/T 20488-2006,油气井聚能射孔器材性能试验方法[S].
  • 3GB/T 20489-2006,油气井聚能射孔器材通用技术条件[S].
  • 4SY/T6297-1997,油气井射孔器评价的推荐作法[S].
  • 5API RP43 Recommended Practices for Evaluation of Well Perforators[S],5ed, 1991.
  • 6API RP19B Recommended Practices for Evaluation of Well Perforators[S],5ed, 2000.
  • 7SY/T5128-1997油气井聚能射孔器通用技术条件[S].
  • 8国防科学技术工业委员会民用爆破器材服务中心.油气井聚能射孔器材性能试验方法:GB/T20488-2006[S].北京:中国标准出版社.2007.
  • 9国防科学技术工业委员会.油气井聚能射孔器材通用技术条件:GB/T20489-2006[S].北京:中国标准出版社,2007.
  • 10李东传,朱贵宝,余海鹰.聚能射孔器混凝土靶穿深性能分析[J].石油工业技术监督,2008,24(6):8-11. 被引量:7

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部