摘要
经物探分析在河北省张家口尚义县大青沟镇南海子村东南1.0 km存在深部断裂构造,为了寻找开发坝上地区地热资源,决定在该位置施工一口2000 m深地热井,即穿过该断裂构造寻找导水通道,完成地热井施工任务。施工中采用了CMD180T型钻机,该钻机采用了先进的全液压传动系统,自动化程度高,性能优异,可大大降低操作人员的劳动强度且易于搬迁、易于操作。其优势在这次地热井工程施工过程中得到了充分的体现。
The geophysical exploration and analysis shows that there is a deep fracture structure 1.0 km to the southeast of Nanhaizi Village, Daqinggou Town, Shangyi County, Zhangjiakou, Hebei Province. In order to explore and develop geothermal resources in the Bashang area, it was decided to construct a 2000 m deep geothermal well at this location, that is, to explore water conducting channels through the fracture structure and complete the geothermal well. The CMD180 T drilling rig was used for drilling, on which the advanced full hydraulic transmission system is adopted, providing high degree of automation and excellent performance. It can greatly reduce the labor intensity of operators and is easy to move and operate. Its advantages have been fully reflected in this geothermal well drilling project.
作者
王雷浩
李光宏
石逊
殷邈
WANG Leihao;LI Guanghong;SHI Xun;YIN Miao(No.9 Geological Brigade,Hebei Bureau of Geology and Mineral Exploration and Development,Xingtai Hebei 054000,China)
出处
《探矿工程(岩土钻掘工程)》
2020年第1期58-61,共4页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
地热井
CMD180T型钻机
全液压
自动化程度高
性能优异
geothermal well
CMD180T drilling rig
full hydraulic
high degree of automation
excellent performance