摘要
抗浮锚杆是建筑工程中控制地下水浮力的重要技术。结合青岛星雨华府北区下沉广场基坑抗浮锚杆工程,基于现有抗浮锚杆设计理论进行了初步方案设计,并运用FLAC3D开展了数值模拟试验,分析了在结构荷载、地下水浮力和锚杆共同作用下基坑底板的受力和变形。在综合考虑受力和施工成本的情况下,得到了抗浮锚杆优化方案。
The anti-floating anchor bolt is an important technique to control groundwater buoyancy in construction works. The anti-floating anchor bolt project for the underground square foundation pit in north Xingyuhuafu in Qingdao was taken as the research object. The preliminary design was carried out based on the existing anti-floating anchor design theory, and the numerical simulation test was carried out using FLAC3 D. The stress and deformation of the foundation pit floor under the combined action of structural loads, underground water buoyancy and anchor bolts were analyzed. The optimization scheme for anti-floating anchor bolts was obtained through trade off of the loading conditions and construction cost.
作者
王绪勇
杨蕾
王会军
管洪博
盛兆旺
WANG Xuyong;YANG Lei;WANG Huijun;GUAN Hongbo;SHENG Zhaowang(Qingdao Geologic and Mineral Geotechnical Engineering Co.,Ltd.,Qingdao Shandong 266000,China;Qingdao Golive Design Co.,Ltd.,Qingdao Shandong 266000,China)
出处
《探矿工程(岩土钻掘工程)》
2020年第1期75-80,共6页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
基坑工程
地下水浮力
抗浮锚杆
FLAC3D
数值模拟
方案优化
foundation pit
underground water buoyancy
anti-floating anchor bolt
FLAC3D
numerical simulation
scheme optimization