期刊文献+

基于比值更新的索穹顶结构找力分析方法 被引量:4

Method of Force-Finding Analysis Based on Ratio Updating for Cable Domes
下载PDF
导出
摘要 为了快速高效求解索穹顶结构的预应力分布,提出了一种基于比值更新的找力新方法.以不断更新的索预应力比值来分配拉索预应力,以索力和位形作为收敛控制参数,迭代得到满足精度要求的预应力分布.基于此,首先对索穹顶结构进行了不考虑重力影响的找力分析,验证了该方法的正确性;其次当考虑重力影响且每个索段划分为多个单元时,可引入沿索长的索水平分力这一不变量,将索力的比值替换为索水平分力的比值.结果表明:基于比值更新的找力分析方法计算速度快,位形偏差小,精度高;考虑重力影响的找力分析结果与不考虑重力影响相差较大(最大为19.34%),索穹顶结构的找力分析宜考虑重力的影响;将每个索段划分为单个单元和多个单元的找力分析结果相差甚微(最大仅0.05%),当索预应力较大且索长较短时,可将每个索段划分为单个单元以简化求解预应力分布. In order to determine the prestress distribution of cable domes efficiently,a new method of forcefinding analysis based on ratio updating was proposed.In this method,values of cable prestresses are preassumed and then constantly adjusted according to the continuously updated ratio of cable prestress;the precise prestress distribution of cable dome is acquired by iterations using the cable force and geometric shape as convergence control parameters.In this way,a force-finding analysis of cable domes is first conducted without considering the gravity effect,which verifies the effectiveness of this method.When the gravity is considered,each cable segment is divided into multiple units.An invariant,the cable force’s horizontal component along the length is introduced and the ratio of cable force is then replaced by that of the horizontal component force to deal with the situation with gravity.The results show that the method of force-finding analysis based on ratio updating is characterized by fast computational speed,small geometric shape deviation,and high precision.The results of force-finding analysis considering the influence of gravity are significantly different from those without considering gravity,and the maximum deviation reaches 19.34%.Thus,the influence of gravity should be taken into account in force-finding analysis of cable domes.In addition,whether each cable segment is divided into one unit or multiple units,the results of force-finding analysis make little difference(0.05%maximum deviation).Therefore,in cases when the cable prestress is large and cable length is short,each cable segment could be divided into only one unit to simplify the solving process of prestress distribution.
作者 姜正荣 刘小伟 石开荣 林全攀 JIANG Zhengrong;LIU Xiaowei;SHI Kairong;LIN Quanpan(School of Civil Engineering and Transportation,South China University of Technology,Guangzhou 510640,China;State Key Laboratory of Subtropical Building Science,South China University of Technology,Guangzhou 510640,China)
出处 《西南交通大学学报》 EI CSCD 北大核心 2020年第1期150-157,共8页 Journal of Southwest Jiaotong University
基金 广州市科技计划项目(1563000257)
关键词 索穹顶结构 找力分析 基于比值更新的找力分析方法 索水平分力 cable dome force-finding analysis method of force-finding analysis based on ratio updating horizontal component force of cable
  • 相关文献

参考文献11

二级参考文献37

共引文献206

同被引文献32

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部