摘要
东曲煤矿+860水平辅助运输系统复杂、运输环节多、运输效率低,且尚未拥有相对完善的辅助运输系统,造成+860水平现用辅助运输系统不能满足日益繁重的生产工作任务。该矿主要采用石门胶轮车运输、区域内单轨吊的运输方式,进行单轨吊辅助运输系统改造,并对其带来的经济效益进行分析,期望可以对矿井辅助运输系统改造提供一定的借鉴。
Dongqu coal mine +860 level auxiliary transportation system is complex,and has many transportation links.The efficiency of transportation is low and imperfect, as a result, the existing auxiliary transportation system of + 860 level cannot meet the increasingly heavy production tasks. The auxiliary transportation system of monorail crane was reformed by adopting the transportation mode of Shimen rubber tyred truck and monorail crane in the area, and the economic benefits brought by it were analyzed, hoping to provide some reference for the transformation of auxiliary transportation system of mine.
作者
薛立国
XUE Liguo(Xishan Coal and Electricity Dongqu Coal Mine,Taiyuan 030200,China)
出处
《机电工程技术》
2019年第12期48-50,共3页
Mechanical & Electrical Engineering Technology
关键词
东曲煤矿
单轨吊
辅助运输系统
升级改造
Dongqu Coal Mine
monorail crane
auxiliary transport systems
upgrade