摘要
A核电机组核岛钢板屏蔽墙(SC结构)主要参考了国外AP1000中防御大型商用飞机对屏蔽墙撞击破坏的设计,将原有的钢筋混凝土结构屏蔽墙改为钢板混凝土屏蔽墙,为国内核电项目首次使用。由于钢板屏蔽墙(SC结构)与钢制安全壳(CV结构)墙体间距仅1.33 m左右,两者在核岛安装时会相互干涉影响。因此,分析了SC结构与CV结构核岛安装阶段的施工逻辑及其相互影响,并给出了相应的解决措施,以期为后续施工提供理论参考。
The steel plate shielding wall(SC structure) of nuclear island of A nuclear power unit mainly refers to the design of protecting large commercial aircraft from impact damage of shielding wall in AP1000 nuclear power abroad,replacing the original reinforced concrete shielding wall with steel plate concrete shielding wall,which is used in domestic nuclear power projects for the first time.Because of the narrow distance of 1.33 m between the steel plate shielding wall(SC structure) and containment vessel(CV structure) wall,they will interfere with each other in the installation stage in nuclear island.Accordingly,this paper analyzed the construction logic and interaction of SC structure and CV structure in installation stage in nuclear island,and proposed the corresponding solutions,in order to provide a theoretical reference for the follow-up construction.
作者
朱茂林
赵岩
武伟
张增魁
王振军
ZHU Maolin;ZHAO Yan;WU Wei;ZHANG Zengkui;WANG Zhenjun(State Nuclear Power Engineering Company,Rongcheng 264312,Shandong,China)
出处
《能源与节能》
2020年第1期56-58,共3页
Energy and Energy Conservation
基金
国家科技重大专项(2018ZX06002002)
关键词
核电
SC结构
CV结构
施工逻辑
nuclear power
SC structure
CV structure
construction logic