期刊文献+

切顶卸压自动成巷无煤柱开采切缝爆破试验方案研究 被引量:2

Study on the Testing Scheme of Slotted Blasting in Non-pillar Mining for Roof Cutting and Pressure Relief Automatic Roadway Formation
下载PDF
导出
摘要 对切顶卸压自动成巷无煤柱开采切缝爆破进行试验研究。以亿欣煤业XV1306工作面为对象,结合亿欣煤业XV1306工作面情况,设计了以3连孔起爆、间隔1孔的起爆方式为主的爆破试验方案。结果显示,该工作面切顶卸压自动成巷无煤柱开采切缝爆破施工按500 mm间距试验最佳结果的爆破参数进行,采用多孔连爆不留间隔孔的方式。 The experimental study on the slotted blasting in non-pillar mining for roof cutting and pressure relief automatic roadway formation was carried out.Taking the XV1306 working face of Yixin Coal Industry Co.,Ltd.as the object,combined with the situation of XV1306 working face of Yixin Coal Industry Co.,Ltd.,this paper designed a blasting test scheme based on the initiation mode of three consecutive holes with one hole interval.The results showed that the slotted blasting construction in nonpillar mining for roof cutting and pressure relief automatic roadway formation in the working face was carried out according to the blasting parameters of the best results of the 500 mm spacing test,and the method of multi-hole continuous blasting without interval holes was adopted.
作者 王园 WANG Yuan(Jinsheng Yixin Coal Industry Co.,Ltd.,Jincheng Anthracite Mining Group,Qinshui 048200,Shanxi,China)
出处 《能源与节能》 2020年第1期132-133,161,共3页 Energy and Energy Conservation
关键词 切顶 自动成巷 开采切缝 roof cutting automatic roadway formation mining slit
  • 相关文献

参考文献1

二级参考文献24

共引文献12

同被引文献8

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部