摘要
分析了当前医院暖通空调系统在设计运行中存在的如管理制度不完善、冷热源设计不合理、地下室冬季采暖温度不达标等问题,结合山西白求恩医院在暖通空调系统管理运行中的经验,针对性的提出了解决常见问题的对策。
This article in view of the current problems in the operation of the hospital in the design of HVAC system,such as incomplete management system,cold and heat source design is unreasonable,the basement temperature of heating in winter is not up to standard,combined with Shanxi Bethune hospital in HVAC system management experience in operation,and targeted puts forward some countermeasures to solve related problems.
作者
张鑫
Zhang Xin(Shanxi Bethune Hospital,Taiyuan 030032,China)
出处
《山西建筑》
2020年第3期110-111,共2页
Shanxi Architecture
关键词
医院
空调系统
冷热源设计
hospital
air-conditioning system
cold and heat source design