复杂地质条件下桩基施工方法及质量控制 被引量:4

Construction Method and Quality Control of Pile Foundation under Complex Geological Conditions
下载PDF
导出
摘要 随着我国西部城市土木工程设施不断地建设与发展,复杂地质环境大大增加了桩基的施工难度。本文针对延安至延川高速公路一期工程中高昴湾小桥、李渠小桥及通道所处的粉砂层、圆砾层等复杂地质条件特点,采取了钻孔灌注桩施工方法,同时探索了桩基施工的质量控制手段及风险防范措號,为今后的桩基工程施工提供一定的参考和借鉴。 With the continuous construction and development of civil engineering facilities in western China,the complex geological conditions have greatly increased the difficulties of construction of pile foundations.In this paper,in term of the characteristics of complex geological conditions such as silt layer and round gravel layer in the Zhonggaowan and Liqu small bridges and passages in the first project of Yangao-Yanchuan highway,the bored pile engineering method was adopted.Meanwhile,the quality control methods and risk prevention measures of pile foundation under complex geological conditions were explored,which will provide some references for the construction of pile foundation engineering in the future.
作者 折文刚 SHE Wen-gang(No.5 Engineering Company,China Railway 18 Bureau Group,Tianjin 100855)
出处 《石家庄铁路职业技术学院学报》 2019年第4期22-25,共4页 Journal of Shijiazhuang Institute of Railway Technology
关键词 复杂地质 桩基施工 钻孔灌注桩 质量控制 风险防范措施 complex geological conditions pile foundation construction bored pile quality control methods risk prevention measures
  • 相关文献

参考文献6

二级参考文献19

共引文献30

同被引文献19

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部