BIM技术在大型地下车库的施工进度信息化管控研究 被引量:5

Research on information management and control of construction progress with bim technology in large underground garage
下载PDF
导出
摘要 传统粗放式项目管理在进度管控方面存在多方面问题。本文通过BIM技术在某大型地下车库项目的施工进度管控中的应用,展示BIM-3D模型构建、BIM+进度四维模拟和施工现场协同的全过程,分析BIM技术在施工进度管控中的应用优势,积累的实践经验可为同类工程提供一定的技术参考。 There are many problems in the schedule management and control of traditional extensive projects. This paper demonstrates the application process of BIM-3D model construction, BIM+progress four-dimensional simulation and construction site coordination through the application of BIM technology in the construction progress control of a large underground garage project, and analyzes the application advantages of BIM technology in construction schedule management and control. The accumulated practical experience can provide a certain technical reference for similar projects.
出处 《中国建材科技》 2019年第6期111-112,99,共3页 China Building Materials Science & Technology
关键词 BIM技术 BIM四维模拟 现场协同 施工进度信息化管控 BIM technology BIM four-dimensional simulation on-site coordination construction progress information management
  • 相关文献

参考文献3

二级参考文献6

共引文献138

同被引文献45

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部