地下室超前止水带在施工中应用研究 被引量:1

Research on Application of Premature Water Stop Belt in Basement Construction
下载PDF
导出
摘要 传统拆迁路线的建设将在主体结构建成一段时间后关闭,以满足现代住宅部门在时间、成本、安全和环境友好方面的需求。因此,后期建设中要有先进的停水技术。一旦基础工程完成,就可以进行外墙的地下密封以及土建工程的隔离和挖握,这将缩短施工时间、降低成本,减少地下降水和清除深基坑,进行更环保的施工,基于此,进行地下室超前止水带在施工中应用研究,为类似工程提供借鉴。 The construction of the traditional demolition route will be closed after the main structure is completed for a period of time to meet the needs of the modem residential sector in terms of time,cost,safety and environmental friendliness.Therefore,in the late construction,there must be advanced water suspension technology.Once the basic project is completed,underground seals of external walls and the isolation and excavation of civil works can be carried out.This will shorten the construction time,reduce costs,reduce groundwater and clear deep foundation pits,and carry out more environmentally friendly construction.
作者 李学宁 Li Xue-ning
出处 《建筑技术开发》 2019年第23期49-50,共2页 Building Technology Development
关键词 地下室 超前止水带 SBS防水卷材 basement forward stop water belt SBS waterproof membrane
  • 相关文献

参考文献3

二级参考文献6

共引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部